Noble Environmental is committed to openness and transparency. All of the information contained in the Draft Environmental Impact Statement (DEIS) for our Chateaugay and Bellmont Windparks is presented here, with the exception of pages of the DEIS that identify individual landowners by name.
Hardcopies are available for viewing at the following locations: Town Clerk's Office of the Town of Chateaugay, Town Hall, 191 East Main St., Chateaugay; Chateaugay Memorial Library, 191 East Main St., Chateaugay; Town Clerk's Office of the Town of Bellmont, 1251 County Rte. 24, Malone, NY 12953; and the Law Office of C.J. Madonna, 10 Oak Street, Plattsburgh, New York 12901. (For additional information contact: C.J. Madonna, Esq. 518-561-6800).
| Chateaugay and Bellmont Draft Environmental Impact Statement Files |
| Title |
Format |
Size |
| Volume I |
|
|
| Table of Contents and Executive Summary |
 |
955 KB |
Section One:
Description of the Proposed Action |
 |
560 KB |
| Section Two: Environmental Setting
and Impacts
2.1 Geology: Environmental Setting - 2.3 Soils: Environmental Setting |
 |
547 KB |
Section Two: Environmental Setting and Impacts
2.4 Soils: Imacts and Mitigation - 2.9 Biological Resources: Environmental Setting |
 |
732 KB |
Section Two: Environmental Setting and Impacts
2.10 Biological Resources: Impacts and Mitigation -
2.31 Mitigation |

|
839 KB |
Section Three: Cumulative Impacts and Benefits
|

|
254 KB |
| Section Four: References |
 |
44 KB |
| Section Five: List of Preparers |
 |
24 KB |
| Volume II, Appendices |
|
|
| Appendix A: Construction Drawings, Specifications, and Engineering Standards, Exhibits A-1 and A-2 |
 |
3.22 MB |
| Appendix A: Construction Drawings, Specifications, and Engineering Standards, Exhibit A-3, pgs. 1-55 |
 |
3.82 MB |
| Appendix A: Construction Drawings, Specifications, and Engineering Standards, Exhibit A-3, pgs. 56-111 |
 |
3.91 MB |
| Appendix A: Construction Drawings, Specifications, and Engineering Standards, Exhibit A-4 |
 |
2.34 MB |
| Appendix A: Construction Drawings, Specifications, and Engineering Standards, Exhibits A-5 to A-8 |
 |
2.53 MB |
| Appendix B: SEQR Documentation, Exhibits 1-2 |
 |
827 KB |
| Appendix B: SEQR Documentation, Exhibit 3 |
 |
1.52 MB |
| Appendix B: SEQR Documentation, Exhibit 4 |
 |
3.08 MB |
| Appendix B: SEQR Documentation, Exhibits 5-7 |
 |
1.40 MB |
| Appendix C: Agency Correspondence |
 |
2.97 MB |
| Appendix D: Wetland Delineation Report, Sections 1-8 |
 |
1.81 MB |
| Appendix D: Wetland Delineation Report, Appendix A: A-Series Mapping - Chateaugay Windpark |
 |
2.49 MB |
| Appendix D: Wetland Delineation Report, Appendix B: A-Series Mapping - Bellmont Windpark |
 |
597 KB |
| Appendix D: Wetland Delineation Report, Maps 1,2 |
 |
1.69 MB |
| Appendix D: Wetland Delineation Report, Maps 3, 4, 5 |
 |
3.82 MB |
Appendix E: Wetland Mitigation Plan
|
 |
257 KB |
| Appendix F: Avian Risk Assessment, Sections 1-6 |
 |
1.27 MB |
| Appendix F: Avian Risk Assessment, Appendices A-F |
 |
4.64 MB |
| Appendix F: Avian Risk Assessment, Appendix G: Work Plan for Post-construction Bird and Bat Mortality Monitoring |
 |
61 KB |
| Appendix G: Visual Impact Assessment |
 |
3.28 MB |
Appendix G: Visual Impact Assessment: Supplemental Visual Resource Assessment, Shadow Analysis, FAA Lighting Plan
|
 |
3.23 MB |
Appendix H: Noise Impact Assessment
|
 |
2.57 MB |
| Appendix I: Local Laws and Ordinances |
 |
1.10 MB |
Appendix J: Communication Signal Study
|

|
1.42 MB |
| Appendix K: Traffic and Transportation Plan |
 |
1.97 MB |
| Appendix L: Property Value Analysis |
 |
1.84 MB |
| NEW! Appendix L: Revised Bellmont Property Value Analysis |
 |
1.03 MB |
| NEW! Appendix L: Revised Chateaugay Property Value Analysis |
 |
1 MB |
| Appendix M: Decommissioning Plan |
 |
32 KB |
Appendix N: Health and Safety Plan
|
 |
966 KB |
| Appendix O: Architectural Survey Report, Sections 1-8 |
 |
3.30 MB |
| Appendix O: Architectural Survey Report, Sections 9-12 |
 |
2.86 MB |
| Appendix O: Architectural Survey Report, Noble Chateaugay Windpark: 5 Mile APE Map |
 |
1.86 MB |
| Appendix P: Phase I Archaeological Study, p. 1-56 |
 |
1.79 MB |
| Appendix P: Phase I Archaeological Study, p. 57-113 |
 |
3.18 MB |
| Appendix P: Appendix A, Photographs |
 |
1.06 MB |
| Appendix P: Appendix B, Shovel Test Log |
 |
400 KB |
| Appendix Q: Laydown and Parking Areas |
 |
4.03 MB |
| Appendix R: Draft Stormwater Pollution Prevention Plan |
 |
183 KB |
| Appendix S: New York State Department of Agriculture and Markets Guidelines for Agricultural Mitigation for Windpower Projects |
 |
37 KB |
| Appendix T: Drain Tile Repair |
 |
298 KB |